Tag Archives: New Breweries 2014

36 days out … Use a Notebook and to do list!

Of the many things this process has taught me, there are several that stand out as key learnings overall.  Its hard to say how one should practice for these things, but likely knowing about them, reading books about them, and talking with others about them are a huge help.

The first thing that I have learned is how to get things done.  I feel like I have always been quite productive in my life.  Not quite sure where I got this, but ever since I turned 30, I have increasingly become a highly productive machine.  To that end, one of the best books I read for preparing for this venture was Getting Things Done by David Allen.  You will not be disappointed if you make the time to read this book.  It will help you be more productive with your days, and organize your life to stay on top of all the details.

Another trait that I knew was deep inside me, but never really exposed is an ability to work long hours with little sleep.  Normally, I am a high energy guy, so when it comes to sleep I like to get 7 hours of bed time a night.  Continuing to exercise and stay fit means that sleep is important.  However, for the past couple months, this has been shaved down to about 5.5 – 6 hours per night, with one night a week at 12.  I find I am capable of this, definitely a little more grumpy, unhappy, etc, but that should be expected.  Find your ability to work long and hard, and you will be in a good position to succeed.

One last trait, one that might just possibly be the most important trait is the ability to not get overwhelmed by the gravity of this situation.  Really, this is one of the most stressful and intense situations an average person could go through, and with the help of friends and family, I have managed to stay positive and on track.  If you have a tough time dealing with stress and multi-tasking, you will need to either take course, read or learn to deal with this possibility.

Another huge help is always having a notebook that contains a to do list.  Make sure you cross things out when they are complete, so you can get the satisfaction of accomplishing something. To do lists are key as are notebooks with all your notes from meetings and discussions.  I can’t tell you how many times I have referenced the book to find something I have been looking for.

Until next post, keep on keeping on!

50 days out update … this may be my last

For a long time this blog has been a pleasure to write.  I enjoyed going over my notes of things, and putting that into the greater community.  The response and positive energy I received along the way was amazing and helped encourage me to continue writing, especially at times that I was either tired or busy (which seems like all the time).  About 2 months ago, the blog started becoming more of a burden, as the amount of time I spent working at the brewery and on my computer increased weekly.  Add in a complete gut of a house my wife and I purchased, and all of a sudden all of my free time evaporated.  Poof!

So given the state of my personal and professional life, and for the sanity and health of my family life and longevity in business, I have made the decision to free myself from the burden of having to write this blog.  Rather than see a note pop up in my calendar every Sunday night to write a blog post, I have removed the reminder from my calendar, and will let things run their course.  For those of you who follow my blog with regularity, feel free to email me with questions you have.  Also, I promise to continue taking my notes, and should I not find the time to blog about this process until the day we open, I will catch up afterwards.  That way this process will be complete.

So for now, this last blog post may actually be 4 or 5 posts rolled into one, as I update all the different aspects of starting a craft brewery that happen about 2 months out from opening.

Brewhouse:  Ideally, you will have your brewhouse arrive about 60 days prior to opening,  Definitely make sure you put any coatings on your floor.  Also make sure you have your installation procedure decided well in advance.  I am sure by this point you know what you are doing, but it had to be said.

Tank Farm:  Big or small, your tank farm should also be in about 60 days prior to opening, most ideally just before or just after your brewhouse goes in.  Be sure to have your Glycol system scheduled for installation, which needs to be done before you can move your tanks into position.  Also plan for your unloading of tanks for the truck and installation into position.  This can be a really finicky process that needs an experienced touch.

Kegs:  You ideally would get these delivered with about 30 days to go until opening.  Getting them delivered too soon (like we did) means you lose valuable real estate in your brewery that could be used for some other things.  More on use of real estate later.  At the end of the day, get the kegs early, but not too early.

Electrical:  If you are getting major upgrades as we are, make sure you the majority of the work done as soon as possible.  Don’t use an electrician who doesn’t commit to getting things completed by certain dates.  More important than saving a few thousand is someone who works with your schedule, and is always ahead of the game.

Mechanical:   I could literally write the same thing again for this heading that I did for electrical.  Make sure the work gets completed when there is the space and option of doing it.  Never wait for stuff to get done.

Marketing:  Holy crap, the marketing becomes a beast by this point in time.  The decisions you make mean the brand you are creating is formally taking shape.  The big important decisions are long complete, but there are a million and one details.  And the saying goes that the devil is in the details.  Some of the important balls in the air right now are:  Website, content for website, business cards, merchandise, increasing social media presence, glasses, sell sheets, coasters, keg labels, etc.  I would say marketing at this point will likely be taking you about 15 hours per week if you are doing anything similar to us.

Tasting Room:  This is one of the last things to get finished, as the production equipment needs to prioritized, but certainly by now the tasting room is well on its way to completion.  You are definitely making the finer decisions now on this.  Things like designing tables, finishing of walls, merchandise area, etc are all needing decisions to keep things moving forward.  We are about to start on construction of a bar, and I can tell you that there are a lot of factors that go into putting this together, and I promise to one day blog about it.

Accounting:  By now, I hope you have figured out a system for managing your books.  It is easily something that gets left, and before you know it, your GST reporting is due, and instead of a few hours work, you have 3 days worth of book keeping to catch up on.  Dave at Powell Street Brewing gave me the recommendation early to do your accounting every 2 weeks, and while I haven’t yet gotten to that frequency, I can see why he recommends it.

Organizing Trades:  We are sooooo thankful we have a general contractor.  Trying to organize and manage the schedule is a full time job, and one that we couldn’t have imagined not having the support of Graham Disher and his fine team.  They have helped us immeasurably every step along the way, and we are firm believers that paying someone to help is the best move we made.  Organizing trades and their schedule is so important as you come down to this point, as when things get done (or not) has a cascade on all the other things that have to happen after.  Any delays means a delay to every subsequent job.

Cold Room:  After going through the building of a cold room, we are really happy we did this, but man, we think getting a prefab cooler would be a lot better choice next time.  I know we will get exactly what we want and need, but the process of building a cooler is an expensive one, that takes a lot of time, and draws people away from other tasks they could be completing.  Depending on your space and the size of a cooler you need, strongly consider a pre-fab.

Cash Flow:  Hopefully you are meeting your budget, but most likely you are not.  This is where you need to make a decision if you have investors.  Do you take a bigger loan to cover your shortfall or do you raise more money.  In about another month we are going to be pressed with this decision, as we will be out of money.  Managing your cash flow until you get open is the most important part of this process and one that you need to keep on top of constantly.

Government Stuff:  Make sure you keep on top of all the interactions you have with government.  You can easily drop the ball on this one, and the resulting error could be catastrophic to your business.  In British Columbia the government has a website that itemizes all the things you need to do and I suggest you refer to this consistently.

Hiring of staff:  About 50 days out you need to figure out your staffing situation, and start getting ready to hire people.  For us that means people in the brewery and also in our tasting room.  We have been dragging our heels on this one, so do as I say and not as I do.

Other General stuff of note:

Use of Real Estate:  During the process of building a brewery, as you reach about 2 months out, your space is a mess.  There are a hundred things inside your brewery that are at various states of completion, which means there is a lot of stuff sitting in different areas.  For us, even though we are in 9,000 square feet, we are running out of room to put stuff.  We have kegs, barrels, packaging, tanks, wood, plywood, insulation, drywall, tools, work stations, etc taking up space all over.  My advice would be to work on being organized as best you can from day 1.  Don’t let the mess and organization become an issue, as it can overwhelm you.

Manage your Expectations:  I am someone who was raised by a very European father, who was adamant that we were never late for things.  While I am not 100% on time, I do think that making a scheduled deadline is important.  When it comes to something as complex as starting a brewery, just plan for 7 months of building if your size is 6,000 square feet or smaller.  And if you are over 6,000 square feet like us, plan for 8-9 months of building.  I know you will always be able to point to examples that go against this timeline, but do so at your own peril.  Just expect things to go wrong and problems to come up that add time.

Manage your sleep and stress:  For me, a lack of sleep goes hand in hand with being more prone to stress.  To give you an idea, right now I am working about 75 hours a week.  I easily work 12 hours per day 6 days per week, and I do try and take a 1/2 day off on the 7th day of the week.  The 2 things that I hate to lose is my sleep and my exercise.  If I do, I get more stressed, grumpy and unhappy.  So for me, I need to continue to exercise (a lot less intensely with all the physical work at the brewery) and get my 6.5 hours of sleep a night.  Any less than that, and I start to burnout.

Celebrate:  If you don’t stop once and while to celebrate the process, you will miss out on the process of following your dreams.  We are all following our dreams when you start a brewery, and if you don’t take a moment to recognize this, then the process will be less rewarding.

Decisions are now to save time or save money:  The process of making decisions has gone from really taking your time and agonizing over the details, to one that is marked by a lack of research and a plethora of going with your gut.  We are still trying to save money as we always have, but now there is a healthy dose of getting decisions made.  In fact, I would say the first question we usually ask is which option is the quickest?

Stay connected with your partner(s):  It is really easy to divide out a job and then not keep in good enough contact with your partner.  We are all guilty of this, but make sure you take time every day to speak with anyone that needs to be part of a decision.  It also helps to have a master sheet schedule, as I have talked about before, so you can itemize the decisions you need to make, who is doing it, and when the drop-dead date is.

Hopefully, with all this stuff going on you can understand why I am going to blog if and only if I have time over the next 50 days.  My to do list is insane, and I can’t keep up with all the items that need decisions.  I hope you understand!  As such, I am going to take off and get some of these things done.  Until next time …. and always email me with any questions.

 

 

 

The Cooler

Busy doesn’t even begin to describe our life right now.  We are so busy trying to get things organized with regards to all aspects of this brewery, it is literally starting to make us crazy.  We are dealing with it the best we can, but it seems we are taking less and less time to make constantly more important decisions.  There is just no time to think, it is more of a reactionary process now.  One of these things we have been reacting to over the past few months is the cooler.

Early on in the process of building a brewery, you will need to make some decisions around the cooler.  Most likely, the first will be where the heck to put the thing.  There is a bunch of factors in making that decision, like if you will have a tasting room, where are your shipping docks, how high are your ceilings all over the warehouse, how much space do you have, etc.  Generally speaking, if you are going for a model that has a tasting room, and you are planning for some production, make sure you put your cooler very near the tasting room, and make it big enough for whatever your beer sales are at year 3.

After you pick out the location, things start becoming more and more detailed in your decisions.  A big one is whether you want to have your cooler pre-fabricated or built on site.  A pre-fab cooler is a quicker option, but you may not get exactly what you want.  Also, depending on the size of the cooler, you may need to build a box around it to support it.  There are some coolers that are not meant to support any weight above them.  If you build your own, there are engineering costs, and the time and effort of putting the things together.  The bigger you build it, the more the costs for everything like labour, materials and professionals.

We also did a few extra things in our cooler that has made it more expensive, but will enable us to have a more functional cooler, and one that works better with our situation.

  • We insulated the ground beneath our concrete to R20.  This was an extra few thousand dollars to do this in extra digging, dirt removal, labour and materials, but we hope the energy savings will benefit us moving forward.  Cool air falls after all, so we thought best to insulate the floors.
  • Since we poured new floors underneath the cooler, we put in drainage.  I think Iain would say that drainage is a must in a cooler, but it can be a time consuming and difficult process.  We just decided to put all new concrete down, so we didn’t have to worry about these things …. we just did it.
  • And since we put in new floors we also put a slope on the concrete so water would run to the drains.
  • Make sure you put footings all around the cooler for the walls to sit on.  Since the cooler will be wet and damp, you should avoid having the walls touch the ground.
  • We made our cooler structural, so that we could store boxes, pallets and other stuff up top of it.
  • Don’t use drywall on the inside of your cooler … even the stuff that is rated to handle wet situations.  You can talk to Dave Varga about that one, as he told us at 33 acres they want to rip it all out.  Use marine grade plywood.
  • If you have any breaks in your moisture barrier, you will moisture in your cooler.  So plug these holes.
  • Use a big door for your cooler, and have a second man door.  The bigger your door, the easier it is for a forklift or pump truck to move pallets in and out of the space.  You want to try and avoid turning on the inside of your cooler with the forklift.  Our cooler is about 25 feet wide, and our door is about 18 feet wide or so.
  • Use a little man door to walk in and out of to avoid needing to open the big door to get something little.
  • We incorporated a cooler very close to our tasting room, so that we could have really short runs for the beer we will have on tap.  Again, Iain could tell you exactly why we did this, but all I know is that it will save us a lot of headaches in the future.
  • We will have jacketed tanks, so this means they will not be inside the cooler.  This frees up a lot of space and will allow us to store finished product in a cool place, ensuring it lasts longer and stays as fresh as possible.  This goes back to making sure your cooler is big enough.
  • Retail doors are important.  One thing we like about Bomber Brewing is that their cooler is also a place to put packaged product.  So you can grab a 12 pack of cans directly from cooler doors and purchase them on site.  This means you don’t need to get a separate cooler to do this, saving energy and costs.
  • We are placing 4 double stacked 15 hectolitre tanks in the cooler for holding our beer.  This will mean we don’t have to change loads of kegs for our most popular beers.  We have been told how much of a challenge this is, as tanks of your most popular beers can run dry 3 or 4 times a day.

All of the decisions around this cooler are pretty much made, so it is just a matter of implementing what we have planned.  The last decision we have to make is whether to use spray foam insulation versus standard insulation.  There are major differences, not the least of which is price and ease of install.  Like every other decision we have made, I am sure the answer will come to us in time …. and hopefully soon.

That is about all I can think of when it comes to our cooler.  For us, we definitely underestimated the spend on an engineer for this, as there is much to figure out when you are building walls that are 14 feet high, and span a 25 foot length.  There are lots of plates and reinforcements you need to install so that this thing will stand through worst case scenarios.

Have a few questions that I am not thinking of???  Send them along and I can surely help you out.

 

Quick Update on Things …

I think back to the days when we were first getting started with the brewery, and I can’t help but think how much time I had to do things.  It didn’t seem like I had a lot of free time, but in reality I did.  What I really had was the ability to get on top of things, which I have completely lost now. Let me try to explain.

When you first start writing your plan, you have time to dream, think about your beers, your brand, name, etc.  It is a natural part of things, and something that if we didn’t do, we wouldn’t be doing this.  As time moves on, you tend to get to more of the meat of the operation, and you need to start figuring out some details.  As time progresses, you think you have figured out a lot of the details of your space.  Things like brewhouse, packaging size, general location of warehouse.  You think you have made a lot of these decisions, but you haven’t.

You continue to work on your business plan, making what you think are decisions and changes of direction …. and then you do it.  You find a space to lease and you take possession.  This is when it starts to really happen.  You actually start making decisions, like general contractor, architect, brewhouse size, etc.  You think you are doing well, because you have made actual and concrete decisions.

What you don’t realize, is that you have only started on the tip of the iceberg.  There are thousands of decisions to make.  None of them are more or less important than any of the others.  Think of details such as these:  Size of cooler door to the inch, length of drainage trenches down to the inch, slope on concrete pour down to the degree, exact location of trade waste interceptor, etc, etc.  There is so many small decisions to make, it can become overwhelming.

Coming full circle, each of these decisions take time, and trust me when I say, you have very little of it.  Your funnel at the top is getting loaded faster than you can empty it.  About a year ago, you could pound out a good 60 hour week and be back on top of everything, but that is a pipe-dream now.  A 60 hour week will only mean that I have about 300 hours of unfinished work sitting around waiting for me to complete.  There is no way of catching up short-term, it is a matter of prioritizing and getting small jobs done.

Add to all this the work around the brewery.  I have been tying rebar and working around the brewery 7 days a week for the past few weeks, and there is still so much to do.  Take for example a typical day in my life.

  • Get up at 5am to 530am
  • Work in front of my computer until 745am
  • Get kids off to school and lunches made 830 to 9am
  • Drive into brewery to do work 930am
  • Manual labour all day at brewery until about 930 am to 3pm
  • Home to do work in front of my computer (accounting, marketing, business planing, etc) 330pm to 5pm
  • Down time, hang with family, 530pm to 8pm
  • After kids in bed, back to computer for more work 8pm to 11pm
  • Off to bed to do it again

This is a pretty standard day, and I know one that my partner also goes through.  If you are going to open a brewery, and you want to take an active role in starting it, be prepared for a day like this.

What you will find is that how badly you really want to do this will go a long way to making the above feel like work, versus feeling like a dream.  Luckily for Iain and I, the long days are a dream and the passion is burning brighter than ever, so we know we have made the right decision.

An Uncomfortable Decision

Throughout the process of starting any business, you learn quickly to deal with unforeseen circumstances on a regular basis.  Things like missed deliveries, unexpected costs, delays by a government body, missing parts, etc.  Recently we had one of the biggest curveballs sent our way, from the most unlikely of places.  Our Structural Engineer who has been working with us a lot lately, just had a heart attack.

For starters, we wish him all the best in his return to health.  Having worked as a pharmaceutical salesperson, I have learned the effect ill health can have on a persons physical and mental well being.  It can effect different people in a number of ways.  So we wish our engineer all the best in getting back to health after such a traumatic experience.

Let me give you a little context to the situation.  A structural engineer is pretty important on most any building process, as there are lots of decisions to be made around making sure big components are sound.  Things like; making sure our floors are structurally sound, the grain hopper is fastened to the building properly, connecting the new curbs to the old concrete slab properly, and making sure the walls and ceilings are properly built so they can handle a heavy load …. you get the idea.  So having someone that understands your project, and someone that works within your timeline is key.

More importantly, when you are at the point our brewery build-out is right now, a structural engineer and their work is critical in moving things ahead.  For instance, there is a list of about 10 things that our engineer is working on, and without his guidance and advice, we can’t make any progress.

Let me now recap a few of our issues with our engineer and you will see why we need to make such an uncomfortable decision.  We picked our structural engineer about 6 months ago, and like a lot of decisions we make, it was based on personality, a referral and price.  He was not from a company or firm, rather just a guy who works on his own … he is the only employee.  Early in the process of things, he gave us some advice, and it seemed very good and we looked forward to working with him on things.

Fast forward to the day we took possession:  February 1st, 2014.  All of a sudden we needed our engineer to start producing some drawings and work for us, but our emails and calls went unanswered.  We reconnected with our architect over this, and they handled things, allaying our concerns and repointing everyone in the right direction (they are good at this).  As our general contractor kept sinking his teeth into the building of our brewery, he had more and more questions for the structural engineer.

He put these questions to the engineer on a regular basis for the next month, until about the beginning of April, when we really started to worry about not getting drawings and answers on what exactly he was supposed to be doing with certain parts of the brewery.  This time we contacted the engineer directly to tell him our concerns.  He gave us a few small little answers, but nothing concrete.  Fast forward to the last week of April, and it was now critical to get answers.  We needed to know about drain construction, floors, connecting old cement with new, etc., and we still didn’t get or have any answers.

A meeting was planned at the end of April to discuss what we needed, and how urgently we needed it, and it went amazingly well.  The engineer agreed that he was late in getting stuff to us, and promised we would have this information for last Friday.  We felt really good about things and moved forward with a positive attitude.

You can probably see where this is going.  Last Friday came and went, and we received nothing. We were pretty disappointed to say the least.  The bottom line is that we need these drawings for work that is getting done right now, and without them, we are opening ourselves up to major problems.  The biggest of these is a delayed opening, which means we will loose even more money in our first year.

Well the news got even worse on Monday morning, as we learned that this engineer had a heart attack and was in the hospital.  And since he is from a company of 1, there was no way to get anything he has done.  So what would you do?  Do you show compassion and wait for him to get out of the hospital, and let him finish the project …. or do we move in a different direction, avoiding any further delays.  We ground our teeth on this one, but as of yesterday we have moved on with a new structural engineer.

In one way its good, as we get a fresh start with someone who hopefully be a little more proactive on getting things done.  Moreover, in our initial consultation he gave us a lot of really good information and advice, something we didn’t get from our last engineer.  In the another way, moving on with someone else is bad.  We have lost all the work that he completed, there is definitely going to be some bad blood over the bill and invoice for work he has done, but not delivered to us on, and we feel bad kicking him when he is down.

At the end of the day, we need to move this process forward now.  So waiting for our engineer to heal and get better, while the right thing to do, is not something we are doing.  We do wish our contractor all the best, and we hope to recovers and gets back on his feet ASAP.  This is just one of the harsh decisions you have to make when starting a business, one that kind of makes you uncomfortable.

 

General Contractors and Sub-contractors

One of the most important decisions you can make is around construction of your brewery.  Do you want to have a general contractor guide the process, or do you feel like you have enough time and energy to take the lead on piecing together the build-out?  Depending on your skills, the amount of time you have, your preference for this kind of thing and most importantly your budget, your decision may already be made for you.

We decided to work with a general contractor, Graham Disher of Disher Contracting.  The process for looking to team with a contractor was relatively painless, as at the end of the day, we decided to work with someone that was willing to work with our constraints.  In other words, we are able to offer some ownership shares in lieu of having to raise the money and then pay it as a fee.  In fact, because craft beer is growing so much right now, you could take this approach with many of the different trades that come through your space, and you would be able to do well for yourself in foregoing fees.

At any rate, Graham was also a good choice for more than just his willingness to work with us.  He had the time to dedicate towards our project, he has good experience that will serve us well in various aspects of the buildout, he was trustworthy (and he has continued to show us that), and what he doesn’t know, he goes about learning in a quick and positive manner.  When you add all these things up, we felt good about teaming with Graham Disher, and we would not hesitate to recommend him for your brewery (once he is finished ours of course).  Get in touch with me if you want to be connected, as he is one of those contractors who is too busy to worry about a website and all that.  In other words, he is hard to find online.

Back to the process of looking for a general contractor.  We met with 4 different GC’s after tossing around the names of about 12 or 15 that were passed our way or in our “rolodex”.  The 4 we met with all had experience, but were all at different stages of their business life cycle.  One company had been around for about 30 years, another just a couple years.  When you meet with these companies you take a list of questions, usually around the process of working with them, budgeting, who is on job, costs, estimates for work, their ideas for your job, experience in this field, etc.  When you start asking questions you will clearly see that there is a big difference in how each of these guys run their business.  Everything from their presentation, to how they budget, when they invoice, what jobs they sub-out, and so on.

What we came to was a list of pro’s and con’s for each contractor, which you then weigh against all the other factors.  Big ones for us include:  What is their mark-up, when could they start, who is going to be site supervisor, how much time are they going to dedicate, how many other jobs do they have, what is their crew like, what is their vision for the project,  what is their timeframe, what are the biggest challenges and how will they overcome, how are they with change … you get the drift.

As for subcontractors, this is really a 2 step process.  The first is to meet with various sub trades that are going to be important to your job.  Likely you will meet with electrical and mechanical  trades people.  You will also do this with the help of your general contractor.   The first objective of meeting with them is to understand what changes you can make to your plans to save money, while at the same time meeting with them to understand who is going to be the best fit for your project.  We met with 4 or 5 electrical and 4 or 5 mechanical contractors.  That allowed us to get some feedback and gauge who was going to work within our constraints the best.  Usually you are basing discussions off a set of drawings that aren’t yet complete.

Hopefully soon after this you will get some IFC drawings for the build-out, and then you can distribute to the 2 or 3 sub-trades that you think would be the best fit.  Once you get the estimates back, you can play them however you like, to try and get a better deal and position the job in the best position for your interests.  For us, number one was not money believe it or not … it was time.  Who could get started and complete the job (in other words, who could dedicate the most manpower to this job) in a fair period of time.  Second was money for us.  Of course all the companies we met with had the proper experience and were keen to be a part of this … that was just standard.

We picked our Electrical Contractor – Clear Energy Solutions.  They have solution in their name for a reason.  They offered us great advice on what to change and what could be streamlined to save money and time.  I would highly recommend these guys to  be at least a part of the bidding process.

We picked our Mechanical Contractor – Nathan from Meridian.  They are a great outfit that has experience in residential and commercial work, they were willing to work with our timeline and they were excellent on price.  I would also recommend these guys to anyone else for all their mechanical needs.

If you want more information on any of this stuff, let me know and I would be happy to add to the information I have put out there.  Bottom line, there are lots of great companies and lots of bad companies and general contractors to work with, just make sure you take your time to make the right choice.  Saving a little money won’t seem worth it if you have to spend extra time on a project.

Floorplan Update and Best Practices

Some of you may have come across a story written by Greg Clow of Canadian Beer News.  If you live in Canada and you are serious about beer, you should be checking his website on a regular basis.  Click here to link with our story and Canadian Beer News.  His article focused on Strange Fellows operations and what our full floor plan will look like when complete.

I have included both the layout we have moved forward with as well as the side profile of the space, so you can get a sense of the way our operations will look.  Not unlike anything else we put out there, things will change somewhat as we move ahead; however, 90% of what is on paper here will be represented in our build-out at the space.  Once you commit to submitting building, electrical and mechanical permits, you are also committing to what you have on paper.  So in other words, the size of a window in our tasting room that overlooks the brew house may get bigger, but we have committed the location for the bathrooms, the trade waster interceptor and the trenches.

Brewhouse Layout March 2014

Brewhouse Profile March 2014

We have allocated a total of $12,500 for permits throughout this process.  I have blogged about them a little bit under The Process of Starting a Craft Brewery, subcategory X:  Government Stuff.  There are lots of permits you need and getting them all in a timely manner is important.  To be honest, the process of preparing for permits and approval is one of the keys to getting this process right.  In short, for your business to move forward you need to submit for your permits in a timely manner, with information that is well thought out, thorough and correct.  Changes or missed steps here will cost you down the road.  Read more about permits at the page linked above (and I will add more details in the next week).

Anyhow, coming full circle here, our floor plan was a real labour of love.  Like any decisions you make with a partner, there is give and take.  However, when you add in an architect, mechanical and electrical engineers, a general contractor and your finances, you get a mish-mash of opinion and information.  You can never make a decision without effecting every other decision you have made in the past, and every other decision you will make in the future.

Some of the keys when creating a floor plan are as follows:

  • Keep everything as central as possible.  The longer runs you have for any electrical or mechanical, the more cash you will bleed.  For us, moving our main electrical panel 10 feet saved us $3,000.  So you can see that small changes can make a big difference.
  • Plan for the future, but prioritize getting to day 1.  It is important to think a couple of steps ahead here, at least that is what I have heard from other breweries, but don’t lose sight that you need to get to day 1.
  • Look to save money at every step.  Ok, maybe you are better at this than I am, but we are in full cash saving mode, and we feel like we have been for a long time.  Any chance we can save money on something, we are doing it.
  • Tasting room and Retail area.  A huge part of all these breweries starting up in Vancouver is the ability to sell your products from your business.  It takes what was once an impossible task, and makes it so much more realistic of an opportunity.  So make sure you design a space that works for your brewery.  For us we wanted something intimate, open to the brewery, and simple.
  • Work with sub trades early in the process.  You don’t have to pick who you are working with, but bouncing plans off them will give you real world answers to questions you have.  It was also help you find savings and efficiencies in your space.
  • Another dilemma on decisions.  You can have things done quickly, you can have things done for your budget, and you can have things done inline with your dreams, but at best you will get 2 of these things, but most of the time you will only get 1 of these things.  What will you pick?
  • Call the room where you mill your grains a “grain cracking room”.  Trust me on this one, it will save you a bunch of headaches at the City
  • Depending on if you are focusing on production or focusing on tasting room/retail sales, your layout may be different.  For us, we are a production brewery first, so the layout and design of the space tried to take this into account as much as possible.  Process workflow, material in and material out, future expansion are all important to us, and are reflected in our space.
  • Keep your cooler close to the tasting room.  Iain has so much experience with this kind of thing, that he is adamant that these 2 things need to be connected.  He talks about the shorter the run of lines, and being able to connect our taps to tanks instead of kegs will save us heaps of time.

What really gets us excited about our space is the connection between the tasting room and the brewery.  When you are sitting in our tasting room, you will quite literally be 10 feet away from the brewhouse.  Want to watch Iain add hops to a brew, just sit back enjoy your beer and watch from your perch.  You will also be able to have a first hand view of the barrel storage area, which we think is a really cool thing.  We also think the art gallery will add a nice connection to the local community, and we hope the growler and retail area will have good process flow so as to not back-up too much.

As I have always said, Iain is really good with this kind of thing, so if you have questions about how to lay your brewery out, feel free to contact us.  At the end of the day, follow your instincts on the way things should be.  Whether you have experience with this kind of thing or not, make sure you follow what you would want as a consumer.  You will deal with enough people along the way that aren’t into craft beer (like contractors, architects, etc) that their opinion will help to balance yours out.  Stay positive and you will find the way.

 

 

 

 

 

 

 

 