Tag Archives: steps in starting a brewery

37 Days Out …. Tasting Room Details

With the changes to tied-house and the ability to have a tasting room and retail area within the brewery, there has been a paradigm shift in the way breweries in BC construct their operations. For a long time, many spaces just took a little retail area, cobbled together a small bar and sold their beer.  However, led by Main Street Brewing, Brassneck and 33 Acres, there is a new breed of tasting rooms that have fundamentally altered the model we are all following.

We have benefited from starting our brewery at a time when these tasting room areas are now allowed in Vancouver by-laws, and as such, we have focused a lot of resources and energy on building and designing this space.  We hope to make it everything we would want in a tasting room.  We have learned a few lessons along the way and it seems right to pass them along.  I have written posts in the past that relate to the tasting room, but this has the best nuggets of information in one place.

Some random thoughts on designing and building your tasting room:

  • Keep the cooler close to the bar, so your beer doesn’t have to travel a long distance to get to the tap.  Pretty self explanatory here.
  • Balance the area between tasting room and retail area.  We have a little retail area on both halves of the tasting room, which means our space seems a little bigger than it is in reality.  This might be a good thing some days and a bad thing on others.
  • Make sure your retail area and tasting room is a reflection of yourself.  Iain and I had a tough time with this, as we see things through pretty different lenses.  I am more modern and Iain is more traditional.  Our space, like our brand and everything else we do, is a amalgamation of both our opinions and preferences.
  • Plan out the flow of people.  Nothing worse than having a space that is hard to move around in when you are busy.  Think about bathroom locations, and also the layout of the retail area, and how it interacts with the bar.
  • Location, separation and number of tap handles for pouring the beer is super important.  We have gone with 2 sets, that Iain can tell you all the specifics on.  Essentially we had Bamford bar service install the lines and taps, and we followed much of their guidance on this.
  • Plan to spend a bunch of money in the tasting room.  The best way to save cash in this area is to do a lot of the work yourself and also to keep it simple.  We will end saving a lot of money, as we found salvaged wood from a few different places, and used materials from our job site in the construction of different parts of the tasting room.
  • Take your time planning the bar.  We went through this over and over on how to layout the bar.  Go see what others are doing, think about all the things you will need in a bar, and also how your space will function, down the to the last detail.  I am talking cash drawer, POS, line-ups, etc. etc.
  • Get a metal fabricator for stainless that is CSA approved.  We used a metal fabricator that is not, which is fine, except when it comes to putting in your sink, which you will need to find a metal fabricator to do that is CSA approved.

I am sure I could find a lot of other things that may or may not be worthy of putting onto this list, but this seems pretty good for now.  I am pretty tired, so need to get some sleep.  We are looking at a crew of about 3 guys 8-10 weeks to finish our tasting room.  That is a lot of work, time and energy they have expended, which also means it is expensive, so try to get everything right you can the first time.

Advertisement

38 Days Out … Boiler Installation and Inspection

Don’t drop the ball on this!  There are a lot of details and a lot that has to go right.  Most importantly, don’t overlook the cost on this.  When you look to purchase a boiler, expect a good chunk of change.  I believe our boiler cost about $13,500 which is only part of the cost.  Installation of the boiler can be almost double the cost of the boiler.  A few best practices that may or may not help you:

  • Get the right size boiler for your operations:  Anything too small or too big will give you headaches, additional cost, take up too much room, not have enough/too much power, etc.  This takes some planning, projecting and ultimately guessing at the end of the day.  We ended up getting a bigger space, so we figured we needed a bit bigger of a boiler to handle future production (we hope!).
  • Put it close to where you need the water:  At first I didn’t understand why Iain wanted to put our boiler so close to the brewhouse, as it was in an awkward spot.  Having seen all the pipes and connections a boiler has, and the incredibly thick gauge of pipe connected to it, put the boiler as close to the brewhouse as you can.  The further away you put it, the dollars and cents will quickly add up.
  • Pre-Inspections are important:  We had a company come in and do a pre inspection to make sure we were putting it the correct distances away from other objects, it was positioned right, and we would be able to get our eventual inspection passed.  This was money well spent as they gave us some good advice that helped us down the road.  On their advice, we ended up rotating the boiler 180 degrees and thank god we had them tell us this, as otherwise, we would have failed our inspection and re-connect all the pipping at a huge time and financial cost
  • Inspection required before you fire it up:  Before you can’t start using your boiler, and that means start cleaning and sanitizing your equipment, until you pass your inspection.  Period. So make sure your boiler is ordered, delivered and installed well ahead of time.  If not, you will be leaving no margin of error

So that is my little advice on a boiler.  Our mechanical contractor Nathan Pulice was incredible throughout this process, but especially for us during the boiler install.  I would highly recommend for anyone who needs any mechanical, plumbing, HVAC, etc to contact him … especially if you are starting a brewery in Vancouver as he has superior knowledge about everything.  Nathan can be called reached at (778) 227 8219 or visit his website here http://www.meridianplumbing.ca.

Tomorrow I will talk about finishing of the front of house.  There is a lot of navigation required for this, and a few best practices to share.

39 days out …. The beginning of the home stretch

Its about time we can say this:  We are now in the home stretch!  Man-o-man that feels good, as this process has really dragged on  …  What I have come to realize is there are many challenges to opening a larger than average brewery, and while it will work out for us in the long term, it has made both Iain and I much more grey!  We also understand that bigger breweries are usually the domains of big companies and investment groups, as cash gets sucked up pretty quickly on a million and one things.

So we are about 39 days from opening, and the list of things to do is immense, not the least of which is blogging to help everyone prepare for this step in their process.  Trust me, you will be tired, tired or being tired, broke, tired of being broke, looking at a to do list about 100 things long, anxious about the beer you will make and if everyone will like your brand, hopeful that you get good reviews, and most importantly enjoying the most amazing ride of your life.  Both Iain and I find that we don’t celebrate our little victories enough, and it is something I would suggest you do at every stage of the process.  There are many milestones in the road to starting a brewery, and take each one in stride.

From here on out, I am going to try and write a blog post every day, so I can highlight some of the details in the home stretch and what that means to you.  There are a lot of details to come together in the very end, and hopefully by sharing these bits of information, you can prepare for the end of the job, which is the most important part of things.  Getting sloppy here can give you bad beer, poor marketing, less than ideal staff, and a host of other issues you never thought possible.  But have no fear, there is no rocket science involved in things … just hard work and strategic decision making.

 

A Crushing Day for Us ….

Well, the last 36 hours has been full of angst on behalf of both Iain and myself.  We finally received a detailed budget from our general contractor, and to put it bluntly, we are going to be way over budget on building our brewery.  It is an extremely bitter pill to swallow, especially after the increases we have made throughout this process to our budget.  At the end of the day, we are building a much larger brewery than we anticipated, and with a larger brewery comes bigger costs.

When I look back at my old copies of the business plan, I have to chuckle to myself as I once thought the retrofit of a warehouse, not including equipment, was going to cost about $400,000.  I look at that number and can’t help but think how naive I was.  That is both a good thing and a bad thing.  If I knew how much this endeavour was really going to cost I might have passed on following this particular dream.  I thought the $400,000 was enough to put up some walls, trenches, upgrade power, and put all the equipment in.  Boy was I wrong.  This was about 2012 when I was really starting to get into planning this brewery

Fast forward to late 2012, and after much encouragement from other brewery owners that I met with, we increased this amount to about $550,000.  In my mind, this was an increased of about 30% over my initial budget, and I thought this would be plenty.  But as you learn more about what is required to retrofit a warehouse, the number keeps getting chipped away.  All of a sudden, the additional money that came with a bigger budget seemed to have disappeared.

Fast forward again to early 2013, and it was time to increase the retrofit budget again.  It just seemed impossible that with tasting rooms and their pending approval, along with the realization of additional costs with most spaces, that we could retrofit a space for any less than about $650,000.  At the time, this seemed like a good number, and even included a sprinkler upgrade and water line upgrade.  We figure we would be free and clear, so we charged ahead with this number in our mind.

It was at this time we started to inquire with investors about financing our brewery.  We based many assumptions on this cost, including how much we needed to raise from angel investors.  $650,000 seemed like our golden ticket to get everything we wanted.  So we charged on and hoped that we could what we wanted for this amount.

Then in the summer of 2013 we found what would eventually become our warehouse.  It was bigger than we really needed, but it gave us an excellent location, and most importantly a great landlord that wanted a brewery in his building.  We had our architect in, a couple contractors, some sub trades, engineers, etc and they all pointed to a retrofit cost of about $725,000, depending on a lot of things, such as electrical upgrade and flooring.  I have written about these items in the past, and they were huge uncertainties with out space.  So we moved forward with a newly increased budget of about $725,000 for a retrofit.

So fast forward to this week.  We met with our architect and general contractor to discuss the quotes they have received from sub trades (like mechanical contractor, electrical contractor, concrete slab specialist, etc) and also the budget from our general contractor on all the little things that make up our brewery.  All of this information, along with our wishes and desires, was put into a spreadsheet and at the very bottom of a huge excel file, there sat what was the anticipated retrofit cost of our brewhouse.  The total estimated cost for our retrofit was (drum roll) …. $925,000. 

It is hard to put into words what was going through my mind when this was presented.  It was like someone kicked me in the stomach …. and then kicked me again.  It was awkward for our architect and our contractor, as they could see that what I had believed and what I had assumed was wrong.  I must have looked like a deer in headlights.  Even now, I am fully consumed by frustration and anger that I just can’t seem to shake.  How is it possible that I ever thought $400,000 was enough?  It just seems plain old absurd!

We are so deep into this process, so far down the road, that there is no option but to find solutions.  For starters, it is very likely that the tasting room will have picnic tables and used chairs, be lacking any real artwork and design aesthetic, and have very little “extras” that other tasting rooms might have.  We have also had to dial back a few optional pieces of equipment that we hoped to have for the brewery.  Essentially, there will be a cascade of changes that are mostly out of our control, in addition to some extra cash that we need to raise from investors.

If I could pass some information onto others, I would make note of the following costs you might be looking at:

  • Electrical Upgrade – $75,000 and up
  • Mechanical – $125,000 and up
  • Tasting Room – $50,000 and up
  • Labour costs – $100,000
  • Development and Building Permits – $10,000
  • Concrete – $25,000 and up
  • Boiler and Installation – $35,000
  • Contingency – Easy 10% of your budget
  • Architect Fees – $25,00 and up
  • Engineer Fees – $20,000 and up
  • Management Fee (from General Contractor) – Cost plus 10%
  • Epoxy Flooring – $15,000 and up

Of course there is a long list of other small items, and they have all creeped up in cost, as we have a 9,000 square foot space.

In another few months, I will be sure to post all of our business plan online, so you can see for yourself what all the details in starting a brewery are.  For now, just know that what you think things will cost, will likely double from your initial estimates.  Just hope and pray that you have way more money than you need, or at least a network of people who would be able to offer some financial support to your business.

I hope to have some answers to our dilemma early next week, and I will pass along any notes I have on how to find savings in a budget that doesn’t seem to have a lot of wiggle room.